🌎 Última Parada: Historias del Mundo hasta 50% OFF + 3 cuotas sin interés con MP  Ver más

Enviar a
C.A.B.A., Ciudad Autónoma de Buenos Aires
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Critical Paths: Blake and the Argument of Method (en Inglés)
Formato
Libro Físico
Idioma
Inglés
N° páginas
394
Encuadernación
Tapa Dura
ISBN13
9780822307518

Critical Paths: Blake and the Argument of Method (en Inglés)

Miller Dan,Bracher Mark,Ault Donald (Autor) · Duke University Press Books · Tapa Dura

Critical Paths: Blake and the Argument of Method (en Inglés) - Miller Dan,Bracher Mark,Ault Donald

Libro Nuevo Importado
Envío: 13 a 19 días háb.
$ 348.638$ 174.319
-50%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan 5 unidades

$ 174.319
Llega entre el 23 Sep y el 01 Oct a C.A.B.A., Ciudad Autónoma de Buenos Aires. Seleccionar ubicación

Reseña del libro "Critical Paths: Blake and the Argument of Method (en Inglés)"

The great expositors of Blake and those who have followed in their footsteps have clarified the most minute particulars of Blake's vision. Now, in the place of traditional exegesis, comes a significantly new set of critical problems and interpretive methods. In this volume of essays, the major shift in Blake studies, already under way in practice, is addressed, gauged, analyzed, and debated.The contributors assembled here, leading exponents of contemporary critical methods as well as close students of Blake, argue the grounds, purposes, and validity of each approach and then apply its method in detailed readings of Blake's works. We see deconstruction, psychoanalytic interpretation, feminist critique, semiotic analysis, Marxist criticism, revisionism, and other methods brought to bear on Blake's texts and into confrontation with one another by those best able to do so.Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Dura.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes