Las preventas y novedades mas esperadas del año hasta 10% + envio gratis a partir de $50.000  Ver más

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (en Inglés)
Formato
Libro Físico
Idioma
Inglés
N° páginas
54
Encuadernación
Tapa Blanda
Dimensiones
27.9 x 21.6 x 0.3 cm
Peso
0.15 kg.
ISBN13
9781500615123

Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (en Inglés)

Commission, U. S. Nuclear Regulatory (Autor) · Createspace Independent Publishing Platform · Tapa Blanda

Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (en Inglés) - Commission, U. S. Nuclear Regulatory

Libro Nuevo

$ 47.855

$ 59.819

Ahorras: $ 11.964

20% descuento
  • Estado: Nuevo
Origen: Estados Unidos (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Lunes 05 de Agosto y el Lunes 19 de Agosto.
Lo recibirás en cualquier lugar de Argentina entre 1 y 3 días hábiles luego del envío.

Reseña del libro "Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (en Inglés)"

This document is a supplemental safety evaluation report (SSER) for the license renewal application for Vermont Yankee Nuclear Power Station (VYNPS) as filed by Entergy Nuclear Operations, Inc. and Entergy Nuclear Vermont Yankee, LLC. (Entergy or the applicant). By letter dated January 25, 2006, Entergy submitted its application to the United States Nuclear Regulatory Commission (NRC) for renewal of the VYNPS operating license for an additional 20 years. The NRC staff published a safety evaluation report (SER) in two volumes, dated May 2008, which summarizes the results of its safety review of the renewal application for compliance with the requirements of Title 10, Part 54, of the Code of Federal Regulations, (10 CFR Part 54), "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." The NRC staff published Supplement 1 to the SER in October 2009 which documented the safety review results of confirmatory environmentally adjusted fatigue cumulative usage factors analyses for the reactor core spray nozzle and the reactor pressure vessel recirculation outlet nozzle at VYNPS. The applicant provided these analyses in response to the staff's proposed license condition that would require Entergy to perform these fatigue analyses no later than 2 years prior to entering the period of extended operation.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes